Rebuilding of the Workshop

Rebuilding of the workshop stared in autumn 2020 with the partial building of the end wall inside to allow a new power supply to the building to be installed.

Then the winter and lockdown arrived!

Spring and lockdown is easing so work was able to resume.

Block work at workshop end nearing completion.
That’s the building secure so work moves to fitting out.
Fitting out is going well and a set of points has already been rebuilt, next is a complete overhaul of the club raised level carriages.