New 7.25″ Bridge Across Raised Level Track

Construction has started on the 9M bridge over the new raised level track to carry a 7.25″ extension loop.

 

p1030472-800 p1030474-800 p1030482-800

Work progressing well now waiting for the braces to be manufactured